BlogFebruary 25, 2026

Reminder: EPA Biennial Hazardous Waste Report Due March 1, 2026

Federal and state hazardous waste regulations require certain RCRA hazardous waste generators and facilities that treat, store, or dispose of RCRA hazardous waste to report their activities biennially. The deadline is March 1, 2026.

Reminder: EPA Biennial Hazardous Waste Report Due March 1, 2026

Purpose of the Biennial Report

The Department of Toxic Substances Control (DTSC) and the United States Environmental Protection Agency (U.S. EPA) share a mission to protect human health and the environment. They enforce strict management standards for hazardous wastes and gather information about generation, management, treatment, storage, transportation, and final disposition of hazardous waste in the state.

Federal and state hazardous waste regulations require certain federally regulated (RCRA) hazardous waste generators, as well as facilities that treat, store, or dispose of RCRA hazardous waste, to report their hazardous waste activities biennially in odd-numbered calendar years.

The information collected will:

  • Provide the U.S. EPA and DTSC with insight into current hazardous waste generation and management in the United States
  • Demonstrate trends and changes in waste management and quantity when compared to previous years' reports
  • Be summarized and provided to the public, primarily through publication of the National Biennial RCRA Hazardous Waste Report

Filing Requirements

If your facility generated, stored, treated, or disposed of hazardous waste above regulatory thresholds in 2025, you may be required to submit a Biennial Report to the California Department of Toxic Substances Control by March 1, 2026.

The report includes: waste quantities, waste codes and management methods, disposal/recycling destinations, and generator status.

Contact expert Nalinna Rasu at nrasu@citadelehs.com for guidance.

More in Blog

September 15, 2026

$73 Million Approved for Zero-Emission Trucks & Infrastructure

The South Coast AQMD Governing Board has approved $73.1 million through the WAIRE Mitigation Program to support zero-emission Class 4-8 trucks, zero-emission yard trucks, and related charging and fueling infrastructure. Eligible applicants include warehouse operators, fleet operators, and infrastructure providers serving warehouses, with funding prioritized for communities where WAIRE fees were collected.

August 17, 2026

Completing an SPCC Plan in Oregon and Washington: What Facility Operators Need to Know

If a facility stores oil above federal thresholds and a spill could reasonably reach navigable waters, an SPCC Plan may be required under 40 CFR Part 112 -- and Oregon and Washington facilities often have additional state spill-reporting and industrial stormwater obligations to coordinate alongside it. This guide covers what belongs in an SPCC Plan and how to align it with state permitting requirements.

August 11, 2026

Contaminated Media Management Plans: Keeping Construction Projects Moving in Oregon and Washington

Construction projects on former industrial, commercial, or redevelopment sites don't always start with clean soil and groundwater, and a Contaminated Media Management Plan developed before construction begins can protect workers and the public while reducing costly delays. This guide covers what a CMMP should include and how it coordinates with construction stormwater and NPDES requirements in California, Oregon, and Washington.

Work with us

Have Questions?

Our team of EHS&S experts is here to help with your environmental, health, and safety needs.