Refinery Emergency Fire Asbestos Consulting
Confidential Client Petroleum Refinery
Southern California

Client
Confidential Client Petroleum Refinery
Location
Southern California
Primary Service
Building SciencesAfter a fire damaged the Delayed Coker Unit and other areas of a major Southern California refinery, Citadel EHS was contracted to assist with an emergency response during the recovery period, which entailed the cleanup and abatement of damaged asbestos-containing materials, plus the draining of all DCU equipment.
We provided the refinery with a team of 5 certified Industrial Hygienists to implement industrial hygiene and abatement programs, plus ensure environmental compliance with local, state, and Federal regulations during the entire 5-week cleanup/recovery period.
During the process, our team worked around the clock, conducting real-time air monitoring with a photo ionization detector for hydrogen sulfide, benzene, and volatile organic compounds - any samples were collected using organic vapor monitors and summa canisters depending on the material stored.
Other work included the collection of materials coated in Hexavalent Chromium, and air samples containing hydrocarbons. The final outcome was a fully documented and decontaminated area to continue working under safe conditions.
Highlights:
- Emergency Response and Site Support
- Industrial Hygiene Monitoring (Real-Time and Laboratory Sampling)
- Asbestos Abatement Oversight
- VOC, Benzene, and H2S Air Monitoring
- Hexavalent Chromium and Hydrocarbon Sampling
- Environmental Compliance Oversight
- 24/7 Cleanup and Recovery Support
- Documentation and Decontamination Verification
Related Work
Explore More Projects
Start a project
Facing something similar on your project?
Tell us where things stand. We'll route you to the practice leaders who've handled it before — typically within one business day.


