Client
Silverado Contractors (on behalf of LADWP)
Location
Sun Valley, CA
Primary Service
Building SciencesCitadel EHS (Citadel) was engaged by Silverado Contractors, Inc. to provide Environmentally Regulated Materials (ERMs) Consulting Services for the planned demolition of Units 1-4 at the Valley Generating Station, operated by LADWP, located at 11801 Sheldon Street, Sun Valley, California.
Citadel delivered comprehensive environmental consulting and monitoring services, tailored to the unique requirements of the Valley Generating Station. The team worked closely with Silverado Contractors and LADWP to validate and supplement prior environmental surveys, ensuring all materials impacted by demolition were properly identified and managed. Services included:
- Targeted Assessments: Identification and assessment of hazardous materials, including asbestos-containing materials (ACMs), lead-containing materials (LCMs), and other regulated substances.
- Abatement Monitoring: Ongoing monitoring and reporting throughout the abatement process, prioritizing safety and regulatory compliance.
- Health & Safety Plan: Development and implementation of a robust Health and Safety Plan, ensuring all site activities met the highest standards for worker and public safety.
- Regulatory Compliance: Coordination with regulatory agencies (SCAQMD, Cal/OSHA) and review of contractor certifications and notifications.
- Waste Disposal: Oversight of regulated asbestos and lead waste transport and disposal at Azusa Land Reclamation Landfill.
By partnering with Citadel, Silverado Contractors and LADWP benefited from expert guidance, proactive risk management, and clear communication at every stage. Citadel’s work enabled the client to move forward confidently, knowing that environmental compliance and safety were handled with care and precision. The project was completed in accordance with regulatory requirements and industry’s best practices, providing peace of mind and transparency for all stakeholders.
Highlights:
- ACMs abated across Units 1-4; all suspect materials managed per regulations.
- LCMs stabilized/abated: doors, windows, trim, conduit, ceilings, walls.
- ERMs removed: FLTs, PCB/non-PCB ballasts, regulated materials.
- Air monitoring confirmed safe fiber levels; EPA clearance achieved.
- Visual inspections ensured compliance and final clearances.