Engineering & Environmental Sciences

Environmental Remediation Design & Engineering

Start a conversation

Overview

Environmental remediation requires more than identifying contamination - it requires a clear, cost-effective strategy solutions that can be implemented in the field real world. Citadel EHS provides environmental remediation design and engineering services for contaminated soil, soil vapor, and groundwater sites, helping clients evaluate cleanup options, meet regulatory requirements, and move projects toward closure.

Our team develops practical remedial strategies based on site conditions, contaminant type characteristics, project goals, regulatory expectations requirements, and budget considerations. From remedial investigations and feasibility studies through remedy design, implementation, system optimization, and post-remediation monitoring, we deliver technically sound solutions that reduce risk, support redevelopment, and protect human health and the environment.

Services

  • 01Remedial Investigations and Feasibility Studies (RI/FS)
  • 02Remedial Action Plans (RAPs) and Corrective Action Plans (CAPs)
  • 03Soil, Soil Vapor, and Groundwater Remediation Design
  • 04In-Situ and Ex-Situ Remediation Technologies
  • 05Soil Vapor Extraction (SVE) and Air Sparging System Design
  • 06Excavation, Soil Management, and Offsite Disposal Oversight
  • 07Pilot Testing and Bench-Scale Treatability Studies
  • 08Remediation System Operation, Maintenance, and Optimization
  • 09Post-Remediation Monitoring and Site Closure Support
  • 10Remediation Strategies for Petroleum Hydrocarbons, Chlorinated VOCs, Metals, PCBs, PFAS, and Other Contaminants

Project profiles

How we've delivered

High-Priority Dry Cleaner Remediation & Redevelopment Support

Private Property Owner & Redevelopment Team

High-Priority Dry Cleaner Remediation & Redevelopment Support

Citadel EHS implemented and manages the remediation of a high-priority dry-cleaning site in Marin County, under the oversight of the San Francisco Bay Regional Water Quality Control Board (SFBRWQCB). The site, which is among SFBRWQCB's highest-priority cases, was impacted by chlorinated volatile organic compounds (VOCs) contamination in soil, soil vapor, and groundwater from historical dry-cleaning operations.

PFAS and Chlorinated Solvent Remediation at a Former Electroplating Facility

Private Industrial Property Owner

PFAS and Chlorinated Solvent Remediation at a Former Electroplating Facility

Citadel EHS is leading the investigation and remediation of a 3.5-acre former electroplating facility in San Mateo County under the oversight of the San Francisco Bay Regional Water Quality Control Board (SFBRWQCB). Site investigations identified chlorinated volatile organic compounds (VOCs), including trichloroethene (TCE), as well as PFAS impacts associated with historical industrial operations.

Comprehensive VOC Investigation, Vapor Mitigation & Site Remediation at Aerospace Manufacturing Facility

Sensor Systems, Inc.

Comprehensive VOC Investigation, Vapor Mitigation & Site Remediation at Aerospace Manufacturing Facility

Citadel EHS provides multidisciplinary environmental, industrial hygiene, and building sciences consulting for an active aerospace manufacturing facility in Chatsworth, California. Citadel’s involvement began with environmental due diligence and expanded as investigations identified chlorinated volatile organic compound (VOC) impacts, including TCE and PCE, requiring further evaluation of soil, soil vapor, groundwater, and potential vapor intrusion pathways.

Environmental Consulting & Redevelopment Support for a Landmark Luxury Hospitality Destination

BH Luxury Residences LLC

Environmental Consulting & Redevelopment Support for a Landmark Luxury Hospitality Destination

One Beverly Hills is a transformative luxury hospitality and residential development located at the western gateway to Beverly Hills at Wilshire and Santa Monica Boulevards. The approximately 17.4-acre project site encompasses the Beverly Hilton, Waldorf Astoria Beverly Hills, adjacent development parcels, and the former service station property at 9988 Wilshire Boulevard. The broader redevelopment plan integrates new hotel and residential development, extensive landscaped open space and amenities, a conference center, below-grade parking, and enhancements to the existing Beverly Hilton.

Work with us

Facing something similar at your facility?

Tell us where things stand. We'll route you to the practice leaders who've handled it before — typically within one business day.

Start a conversation

Tell us about your needs — we’ll respond within one business day.

Inquiring about Engineering & Environmental Sciences — Environmental Remediation Design & Engineering